[All updates](https://qlane.ai/changelog)

Week 23 · Jun 1 – 7, 2026

# Follow a pull-request run stage by stage

Jun 7, 2026

The session page shows which stage a run is in, failed builds explain themselves, and test credentials work in every environment.

A pull-request run goes through several stages, from preparing the environment to verifying the results. The session page now shows the current stage live, so a long run never looks stuck.

When an environment fails to install, build or start, the logs that explain why are now in the dashboard.

* A live stage indicator on pull-request sessions.
* Install, build and start failures show their logs in the dashboard.
* Test credentials on every kind of environment, with the password hidden.
* Project skills: write down instructions and know-how for the agent.
* Compose environments get an editor for their .env file.
* Credits are charged per phase of a run.
* A loading bar on navigation, clickable passed cases, and a link to manage GitHub App access from the repository picker.

[← Newer · Week 24 Conversations that keep going](https://qlane.ai/changelog/continuous-chat) [Older · Week 22 → Review proposed tests in one place](https://qlane.ai/changelog/proposals-and-coverage-matrix)
